The Agenda··7 min read
Two casino hotels, one morning: 763 rooms go before Clark County zoning on Sept. 2
Items 30 through 33 are both resort hotels in Enterprise. One applicant is asking the county to give up a piece of a public street. The other has already been held over once. Here is what is actually being requested, in the county's own words.
Two separate casino hotels are on the same Clark County Zoning Commission agenda Wednesday morning, both in Enterprise, both on Las Vegas Boulevard South, both outside the resort corridor. Together they account for 763 proposed hotel rooms. Neither has been voted on. That is the point of writing about them now.
The Zoning Commission meets Wednesday, Sept. 2 at 9 a.m. in the Commission Chambers at 500 S. Grand Central Pkwy. There are 50 items on the agenda. Four of them matter here, and all four are classified as non-routine, meaning they are set for discussion rather than approval as part of a consent block (Clark County Zoning Commission agenda, Sept. 2, 2026).
The four items
Three of them are one project, filed by V L V 1, LLC, and they have to be read together:
- Item 31 — VS-26-0436. A request to "VACATE AND ABANDON easements of interest to Clark County located between Serene Avenue and Richmar Avenue, and between Interstate 15 and Las Vegas Boulevard South; and a portion of a right-of-way being Richmar Avenue located between Interstate 15 and Las Vegas Boulevard South within Enterprise" (agenda).
- Item 32 — UC-26-0437. A use permit for a resort hotel, two waivers of development standards — alternative driveway geometrics, and non-standard improvements in the right-of-way — and design review for a resort hotel on 13.52 acres in a CR (Commercial Resort) Zone, north of Richmar Avenue and west of Las Vegas Boulevard South.
- Item 33 — SDR-26-0438. Sign design review for a comprehensive sign plan on that same 13.52 acres, described on the agenda as "a 13.52 acre portion of a 35.65 total acre site."
The fourth is a different applicant and a different site:
- Item 30 — UC-26-0397. Filed by MARY BARTSAS 7, LLC. Holdover use permits to "1) expand the gaming enterprise district; and 2) resort hotel," the same two waivers, and design review for a resort hotel on 4.75 acres in a CR Zone, east of Las Vegas Boulevard South and south of Ford Avenue.
That word holdover is doing work. The same case, under the same number and the same wording, was on the Zoning Commission's Aug. 19 agenda and did not get resolved (Clark County Zoning Commission, Aug. 19, 2026). It returns Sept. 2.
What V L V 1's project is
The applicant of record on items 31, 32 and 33 is V L V 1, LLC. Trade and gaming coverage over the past two weeks has attributed the project to Ochoa Development Corporation, and the program described in that coverage matches the acreage and the scope on the agenda. We were not able to confirm the relationship between V L V 1, LLC and Ochoa Development through state business filings, so treat the connection as reported rather than as established here.
What is being proposed, per the plans described in trade coverage: a two-phase resort hotel totaling roughly 404,000 square feet. Phase one is a six-story, 300-room hotel attached to a casino, with food and beverage, entertainment space, conference area, spa and fitness lounge, business area, executive offices and back-of-house, plus a five-story parking garage. Phase one is approximately 321,000 square feet and tops out at 86 feet; the garage's highest parking level sits at 47 feet. Phase two is a second six-story tower adding 150 rooms at 83,200 square feet and 73 feet tall (NVBEX).
The casino itself is reported at 57,000 square feet, with 946 total parking spaces, 211 of them EV-capable and 26 with chargers installed (Casino.org). Design is credited to Gensler and Yihong Liu + Associates, with RCI Engineering as civil engineer and LAS Consulting as project representative (NVBEX).
The project is technically unnamed. "Silverado" appears on the signage plans as a placeholder, which is why item 33 — the comprehensive sign plan — is where the name shows up at all (NVBEX; Vital Vegas). The site is a vacant parcel at the northwest corner of Las Vegas Boulevard and Richmar Avenue, roughly five miles south of the Strip, across from the former Paradise Spa condo complex that was demolished after years of fires and squatting (Casino.org; Yogonet).
The part that has not been reported: the street
Item 32 gets the headlines. Item 31 is the one worth reading twice.
VS-26-0436 asks the county to vacate and abandon a portion of Richmar Avenue itself — public right-of-way between Interstate 15 and Las Vegas Boulevard South — along with county easements in the block between Serene Avenue and Richmar Avenue. Set that against the description in item 33: the hotel occupies 13.52 acres of a 35.65-acre site.
A right-of-way vacation is not a formality. It is the county deciding that a piece of public street is worth more as part of a private assembly than as a street.
Vacations are common and often uncontroversial — stub streets, obsolete alignments, easements that no longer serve anything. But they are a permanent transfer of public land into a private site plan, and once granted they are effectively not reversible. The questions worth asking before the vote are narrow and answerable: what does that segment of Richmar currently connect, what happens to circulation and emergency access if it goes away, and does the remaining 22 acres of the 35.65-acre site imply future phases that depend on the same vacation. We have not seen those answers, and we are not going to guess at them.
The developer's local record
Ochoa Development Corporation is not a newcomer, and it is not a casino company. It has an active Clark County land-use file — two files, in fact, both small and both industrial.
In January, the Zoning Commission approved an extension of time for Durango Storeflex, LLC, an Ochoa Development affiliate, on a three-building mini-storage and warehouse project on 2.3 acres at 7245 Butler St. in Spring Valley. That project was originally approved Nov. 16, 2022. A first extension came in December 2024. The January action was the second, and it gives the developer until Nov. 16, 2027 to commence. It passed during routine action items with no public discussion, and NVBEX reported the applicants as "nearly construction-ready," with traffic and drainage studies complete and county permit review underway (NVBEX).
In February, an affiliate called 2151 Sunset, LLC went to the Board of County Commissioners with a six-building warehouse complex on 2.46 acres at 2151 E. Sunset Road in Paradise — 51,900 square feet total including outdoor storage (NVBEX).
Extensions of time are ordinary. Entitlements outlive market cycles, and a developer keeping a small storage project alive through three years and two extensions is doing something thousands of Clark County applicants do. The relevant observation is one of scale rather than of character: the two Ochoa Development projects currently in the county pipeline total under five acres and under 190,000 square feet between them. The proposal on Wednesday's agenda is 13.52 acres and roughly 404,000 square feet, with a 57,000-square-foot casino inside it.
Michael William Ochoa is described as a longtime Nevada developer and contractor whose company has held an unlimited general building contractor license, with a history in apartment, industrial and timeshare work and no record of developing or operating a casino (Vital Vegas; Casino.org). His earlier land play is a matter of record: in October 2020 he paid $12.5 million for 12.1 acres off Paradise Road near Virgin Hotels, and a company representative said at the time they hoped to be under construction within 12 months, though it "could take 24 or 36 months" (Review-Journal).
The hurdles, as reported
Casino.org's reporting identifies three specific gaps in the proposal as it stands: no public financing, no operating partner, and a development team with no casino development experience. It also reports that the developers asked Michael Gaughan — whose South Point sits just south of the site on the same boulevard (Vital Vegas) — to partner, and that he declined (Casino.org).
None of that is before the Zoning Commission on Wednesday. Land use and gaming licensure are separate tracks in Nevada: the county decides whether the building can go there, and the Nevada Gaming Control Board and Gaming Commission decide, later and independently, whether anyone can run a casino inside it. An approval Wednesday would be an entitlement, not a resort. That distinction is the single most misread thing in Las Vegas development coverage, and it is why we track what happens after the vote as closely as the vote itself.
One more reported detail worth flagging with a caveat: at least one outlet describes the tower as having been scaled back from an original 874-room plan to meet local regulations, and separately places the site at the former SkyVue Ferris wheel property (SoloAzar). The SkyVue description does not match the agenda, which locates the project at Richmar Avenue in Enterprise. We could not corroborate the 874-room figure in primary documents and are noting it only as an unverified claim.
The other resort hotel
Item 30, the holdover, is a genuinely different proposition. Mary Bartsas 7, LLC is proposing a 313-room, six-story hotel casino at the southeast corner of Las Vegas Boulevard South and Ford Avenue, on 4.75 acres.
The program: 274,058 square feet total, with a 169,138-square-foot tower on a two-story podium of 51,120 square feet. The podium holds the casino and amenities on the first two floors; guest rooms occupy floors three through six. Public space totals 30,420 square feet and includes gaming area, restaurants, retail, entertainment and a pool. The tower's primary height is 80 feet with a 100-foot maximum, over a 30-foot podium and an attached three-story, 30-foot parking garage. Parking requirement is 407 spaces; the plan delivers 428, dropping to 411 when Las Vegas Boulevard is widened. Gary Guy Wilson Architects is architect and applicant, Civil Works Inc. is civil engineer, and LAS Consulting — the same representative as on the V L V 1 items — is the correspondent (NVBEX).
The structural difference between the two applications is one line of text. UC-26-0397 requests a use permit to expand the gaming enterprise district. UC-26-0437 does not.
Why that one line matters
The gaming enterprise district is the map of where non-restricted gaming is allowed in Clark County. Under Title 30, applications to enlarge it "shall be accepted by the Zoning Administrator only" when the property is inside the Las Vegas Boulevard Gaming Corridor as defined in NRS 463.3076, is exempted by NRS 463 from NRS 463.3086, or is designated Commercial Tourist in the land use plan. The code states flatly that those requirements "shall not be waived or varied" (Clark County Code § 30.48.260).
For the third path — Commercial Tourist land outside the corridor and inside the BLM disposal boundary — the code imposes hard separations: 1,500 feet from any property used primarily for religious services or a public or private school, and 500 feet from the property line of a developed residential district, defined as residentially zoned land with at least one completed unit on it as of the application date (Clark County Code § 30.48.260; NRS 463.3086).
We are not going to infer either site's status from the absence of a request. What the two filings establish is that one applicant's team concluded it needed a district expansion and the other's concluded it did not, and that is the sort of thing worth asking staff about at the podium.
What the agenda does not say
No staff recommendation appears on the agenda for any of the four items. Clark County publishes staff analysis and recommended conditions in separate staff reports rather than on the agenda face, so the absence of a recommendation here is a limitation of the source document, not a signal about the projects.
There is also no cost figure attached to either proposal in any document or coverage we reviewed. One outlet quoted a characterization of the V L V 1 project as a "substantial long-term investment" with no dollar amount (Yogonet). We do not publish estimates we cannot source, and we do not publish predictions about how a commission will vote.
How to watch it
The Clark County Zoning Commission convenes Wednesday, Sept. 2 at 9 a.m. at 500 S. Grand Central Pkwy. Items 30 through 33 are non-routine, which means public comment is taken and the items are discussed on the record. Agendas, staff reports and archived video are posted through the county's Legistar calendar. The full agenda for this meeting is here.
We will report what the commission actually does, and then we will keep the file open. An entitlement granted on Sept. 2 has a commencement deadline attached to it, and deadlines are the part of this process that almost nobody covers.
Sources
Every figure in this piece traces to one of these. If a number was not in a source, it is not in the story.
- Clark County Zoning Commission — Sept. 2, 2026 agenda (official)
- Clark County Zoning Commission — Aug. 19, 2026 meeting detail
- Clark County Legistar calendar — agendas, staff reports, video
- NVBEX — Silverado Hotel/Casino Proposed in Enterprise
- NVBEX — Six-Story Ford Avenue Casino Hotel Proposed in Enterprise
- NVBEX — Ochoa Development Corporation Receives Second Extension of Time
- NVBEX — Ochoa Development Corporation Proposing Six-Building Industrial Complex
- Casino.org — New casino hotel proposed for 13.5 acres south of Las Vegas Strip
- Vital Vegas — Silverado casino proposed for South Point's front yard
- Yogonet — New 450-room hotel-casino proposed south of Las Vegas Strip
- SoloAzar — New Silverado hotel-casino proposed south of the Las Vegas Strip
- Review-Journal — Developer pays $12.5M for land near Las Vegas Strip
- Clark County Code § 30.48.260 — Gaming Enterprise District enlargement
- NRS 463.3086 — Gaming enterprise district petitions
Spot something wrong? Email corrections@buildinglasvegas.com. We publish corrections within 24 hours and keep them in a public log on our standards page.




